Project Overview – TLW Moulsary Avenue, Gurgaon

TLW Moulsary Avenue was a fast-track liquor store interior project executed by Next BC in Gurgaon. The store was designed with a function-first approach, using metal and glass as the main design elements.

The biggest challenge was time. The authorities took over the old store location, leaving only 24 days to build and open the new store. The store had to become operational on the 25th day.

The first week was focused on footing and column work so that the base structure could be created quickly. During the second week, ducting, electrical work and false ceiling installation were carried out at full speed, while exterior work also continued.

Flooring became the main focus in the third week. In the final three days before opening, rack assembly, electrical finishing, air-conditioning setup, signage and final touch-up work were all carried out together.

Heavy rain created additional difficulty and delayed the main cash counter transportation by one week. Despite the pressure, rain and short timeline, the store opened on the 25th day as planned.

Interior Design

Project Type:
Fast-Track Liquor Retail Store Interior
Clients:
TLW - The Liquor Warehouse
Location:
Moulsary Avenue, Gurgaon
Project Category:
Liquor Store Interior / Retail Fit-Out
Key Scope:
Footing, Column Work, Ducting, Electrical Work, False Ceiling, Flooring, Racks, AC Setup, Signage, Final Finishing

Scope of Work

Fast-Track Execution

Liquor store interior completed within a 24-day schedule to support opening on the 25th day.

Metal & Glass Design

Retail interior developed using metal and glass to achieve a durable, modern and functional design.

Structural Foundation

Footing and column work completed during the first phase to prepare the store for interior execution.

MEP Installation

Ducting, electrical services and false ceiling installed together to maintain the fast-track schedule.

Flooring & Exterior

Flooring and exterior finishing progressed simultaneously to reduce overall project duration.

Store Commissioning

Display racks, AC, lighting, signage and final finishing completed before the scheduled store launch.

TLW Moulsary Avenue liquor store main gallery view
TLW Moulsary Avenue liquor store main gallery view TLW Moulsary Avenue fast-track store interior execution TLW Moulsary Avenue metal and glass liquor retail design TLW Moulsary Avenue ducting and ceiling execution TLW Moulsary Avenue retail flooring and finishing work TLW Moulsary Avenue rack installation and store setup TLW Moulsary Avenue signage and final finishing stage TLW Moulsary Avenue liquor store opened on 25th day TLW Moulsary Avenue completed liquor retail interior

Our Latest Blogs

Explore expert tips, liquor store design ideas and retail interior insights from our latest articles.

Interior Design
5 MIN READ

Importance of Artwork in F&B Interiors

In the F&B business, interior design plays a crucial role in creating the first impression. Many times, a customer decides within a few seconds whether to stay or leave.

Read Article
Interior Design
5 MIN READ

Why is decor important in F&B interiors?

When we talk about F&B (Food & Beverage) interiors, most people focus on furniture, flooring, lighting and layout.

Read Article
Interior Design
5 MIN READ

Challenges in Commercial Kitchen Services (Practical Insights from Site)

Setting up a commercial kitchen is not just about placing equipment and starting operations.

Read Article
Interior Design
5 MIN READ

How a Well-Designed Interior Increases Liquor Store Sales

Spending money on store interiors and building a premium liquor retail experience are two different things.

Read Article
Interior Design
5 MIN READ

How Did the Concept of a Luxury Liquor Store Come About?

In India, the traditional image of a liquor store is far from appealing.Most people associate it with small, cramped shops of about 200 sq.ft.

Read Article
Interior Design
5 MIN READ

The Best Air Conditioning Method For A Liquor Store

When we think about shopping comfort, air conditioning is usually the first thing that comes to mind. While plenty of people may offer free advice on this topic.

Read Article

Frequently Asked Questions

The store was designed with function as the priority, using metal and glass as the main design materials.

The old store location was taken over by the authorities, leaving only 24 days to build and open the new store.

The first week focused on footing and column work so that the base structure could be created quickly for the fast-track store execution.

During the second week, ducting, electrical work, false ceiling and exterior work were carried out. During the third week, flooring became the main focus.

The rain made it harder to work and move things. Rack assembly, electrical finishing, air-conditioning setup, signage and final touches were all completed in parallel during the final three days.

Continuous rain slowed transportation and delayed the main cash counter arrival by about one week, but the store still opened on the 25th day as planned.

Instagram Short Video

Gypsum Ceiling Work
watch on instagram

YouTube Shorts

Behind the Scenes @ 5 NO
watch on youtube

Let’s Work Together

Planning a Fast-Track Liquor Store Interior Project?
Discuss Your Liquor Store Project